high hopes gardens |
| Cutting the pipes that make up the tower. |
![]() |
| Painting the tower. |
![]() |
| Cutting the cables for the tower guy wires. |
![]() |
| Drilling holes for tower brackets and connections. |
![]() |
| Setting and leveling the forms |
![]() |
| Assembling tower base. |
![]() |
| Collaring the tower together. |
![]() |
| Laying out the tower (70 ft) and gin pole (35 ft) - a total of 105 feet of pipe laid out. |
![]() |
| This photo shows the tower, generator and blades all ready to go. |
![]() |
| Assembling the turbine to the tower. |
![]() |
| Attaching the tower rigging cables. |
![]() |